INGENIEURBÜRO
KARL HEINZ GOERKE GMBH
Your partner for design-based engineering construction since 1960.
Certified according to DIN EN ISO 9001
We are a team comprising 5 construction engineers, 10 designers and 3 staff in the Administration Department. We can punctually and professionally implement your projects, irrespective of whether small or large.
Our main focus is hereby placed on load-bearing structures from the industrial and plant construction fields. We can create structural calculation verifications for not only new plants, conversions and refurbishments of old plants but also including recalculation work for existing building components.
Load-bearing and support frameworks for plant construction
Large-scale structures for power stations
All types of hall
structures
Industrial buildings as well as conversions during operation
System scaffolds for utilisation as facade scaffolding, heavy-duty scaffolding and special scaffolding
HUTHMANN ABS / Steel construction
Plant for the delivery and treatment of slag and dust for additional processing as filling material. Tipping out hall and treatment sluice with extraction plant for generating negative pressure.
BRÜGGEMANN / Steel construction
Construction of a new production building and logistics building for the manufacture, packaging and shipping of plastic additives. A fire protection requirement of F90 applies to the entire building. In order to fulfil this requirement, while at the same time assembling quickly with small component dimensions and partly variable interior space, a composite construction was selected for the implementation process. The lift tower and stair tower is structurally separated from the building and was constructed as an in-situ concrete process. The escape stairwells are pure steel constructions. The foundation was carried out with piles at a depth of approx. 10 m into the rock layer.
KONRADSBERG / Steel construction
To simplify shaft transport, the original relocation of the shaft housing (lifting by means of a crane) had to be replaced by a process on permanent rails. Pushing the housing on the rails should therefore be implemented by means of a fork-lift truck via cable pulleys and deflection pulleys.
PROCESS HEAT RECOVERY SYSTEM / steel structure
Steel structure for process heat recovery system
The construction site is located in Uzbekistan, a very active seismic area. The structural engineering was done according to the rules of EN1090 and the Eurocode standards.
The entire steel structure was designed by IBG including design calculation, general drawings and all shop drawings. In addition, various design calculations were done for equipment parts and pipe support saddles.
CONTACT US
Ingenieurbüro Karl Heinz Goerke GmbH
Schönbeinstraße 4 / 74076 Heilbronn
Germany
Phone +49 7131 9861 ‑0 / Fax ‑24
info@ibgoerke.de
COMPANY HISTORY
2019
Restructuring the complete IT environment
2014
Dualis seal awarded from the IHK Heilbronn-Franken as an excellent training company
2004
Initial certification according to DIN EN ISO 9001
1992
First CAD workstation
1988
First PC
1981
Multi-user computer system for implementing more complex calculations
1977
Conversion of the engineering office into a GmbH (limited liability company)
1960
Founding the engineering office in Heilbronn