INGE­NIEUR­BÜ­RO
KARL HEINZ GOE­R­KE GMBH

Your part­ner for design-based engi­nee­ring con­struc­tion sin­ce 1960.

Cer­ti­fied accord­ing to DIN EN ISO 9001

We are a team com­pri­sing 5 con­struc­tion engi­neers, 10 desi­gners and 3 staff in the Admi­nis­tra­ti­on Depart­ment. We can punc­tual­ly and pro­fes­sio­nal­ly imple­ment your pro­jects, irre­spec­ti­ve of whe­ther small or large.

SER­VICES

Our main focus is her­eby pla­ced on load-bea­ring struc­tures from the indus­tri­al and plant con­struc­tion fiel­ds. We can crea­te struc­tu­ral cal­cu­la­ti­on veri­fi­ca­ti­ons for not only new plants, con­ver­si­ons and refur­bish­ments of old plants but also inclu­ding recal­cu­la­ti­on work for exis­ting buil­ding components.

Load-bea­ring and sup­port frame­works for plant construction

Lar­ge-sca­le struc­tures for power stations

All types of hall
struc­tures

Indus­tri­al buil­dings as well as con­ver­si­ons during operation

Sys­tem scaf­folds for uti­li­sa­ti­on as faca­de scaf­fol­ding, hea­vy-duty scaf­fol­ding and spe­cial scaffolding

REFE­REN­CES

HUTH­MANN ABS / Steel construction

Plant for the deli­very and tre­at­ment of slag and dust for addi­tio­nal pro­ces­sing as fil­ling mate­ri­al. Tip­ping out hall and tre­at­ment sluice with extrac­tion plant for genera­ting nega­ti­ve pressure.

REFE­REN­CES

BRÜG­GE­MANN / Steel construction

Con­struc­tion of a new pro­duc­tion buil­ding and logistics buil­ding for the manu­fac­tu­re, pack­a­ging and ship­ping of plastic addi­ti­ves. A fire pro­tec­tion requi­re­ment of F90 app­lies to the ent­i­re buil­ding. In order to ful­fil this requi­re­ment, while at the same time assemb­ling quick­ly with small com­po­nent dimen­si­ons and part­ly varia­ble inte­rior space, a com­po­si­te con­struc­tion was selec­ted for the imple­men­ta­ti­on pro­cess. The lift tower and sta­ir tower is struc­tu­ral­ly sepa­ra­ted from the buil­ding and was con­struc­ted as an in-situ con­cre­te pro­cess. The escape stair­wells are pure steel con­struc­tions. The foun­da­ti­on was car­ri­ed out with piles at a depth of approx. 10 m into the rock layer.

REFE­REN­CES

KON­RADS­BERG / Steel construction

To sim­pli­fy shaft trans­port, the ori­gi­nal relo­ca­ti­on of the shaft housing (lif­ting by means of a cra­ne) had to be repla­ced by a pro­cess on per­ma­nent rails. Pushing the housing on the rails should the­re­fo­re be imple­men­ted by means of a fork-lift truck via cable pul­leys and deflec­tion pulleys.

FOR­EIGN PROJECTS

CON­TA­CT US

Inge­nieur­bü­ro Karl Heinz Goe­r­ke GmbH
Schön­bein­stra­ße 4 / 74076 Heil­bronn
Ger­ma­ny

Pho­ne +49 7131 9861 ‑0 / Fax ‑24
info@ibgoerke.de

bewerbung@ibgoerke.de

COM­PA­NY HISTORY

2019

Rest­ruc­tu­ring the com­ple­te IT environment

2014

Dua­lis seal awar­ded from the IHK Heil­bronn-Fran­ken as an excel­lent trai­ning company

2004

Initi­al cer­ti­fi­ca­ti­on accord­ing to DIN EN ISO 9001

1992

First CAD workstation

1988

First PC

1981

Mul­ti-user com­pu­ter sys­tem for imple­men­ting more com­plex calculations

1977

Con­ver­si­on of the engi­nee­ring office into a GmbH (limi­ted lia­bi­li­ty company)

1960

Foun­ding the engi­nee­ring office in Heilbronn