SÜDWESTDEUTSCHE SALZWERKE AG / Scaffolding
Heavy-duty scaffolding for refurbishment measures for the belt bridge and personnel bridge
CAD DATA
HEAVY-DUTY SCAFFOLDING
The belt bridge and the footbridge had to be temporarily supported for the refurbishment and/or exchange of the bridge supports.
Modular scaffolding elements were utilised to transfer the loads from the bridges into the scaffolding.
Lifting loads were overcome by using ballasting. Horizontal shear loads were transferred into the construction site ground by utilising pegs.
EINBLICKE